Balpara was engaged by WSP to survey and devise an electrical design for the relocation of overhead powerlines, as part of a large residential apartment development in Melbourne’s inner suburbs. Following consultation with United Energy, we were contracted to provide construction and project management services for the undergrounding of 22kV line and UE fibre optic cable.

 

Project Overview


The Balpara team was engaged by WSP to survey 66kV/22kV overhead powerlines to determine sag and sway, and to devise a conventional overhead powerline design. These actions were necessary due to the powerlines close proximity to a new multi-million dollar development.


Our electrical engineering team devised an electrical design that was approved by United Energy. Subsequently, the developer asked us to provide quotes for overhead powerline construction. Balpara successfully secured the construction and project management components of the project to relocate the overhead powerlines. For the next phase, we’ve been engaged to provide electrical design, feature surveying, construction and project management services for the undergrounding of the 22kV line and UE fibre optic cable along Dandenong Road.

 

Project Scope


  • Production of a detailed scope of works document, in addition to a skills matrix, which demonstrates our personnel’s qualifications and training in construction/civil activities
  • Electrical detailing and as-built drawings in line with applicable standards
  • Project management of the implementation of drawings and tender process, plus the recommendation of construction contractor to developer
  • Electrical design of underground powerlines
  • The construction of existing electrical private supply
  • Provision of a civil base plan for water, gas and sewerage
  • Preparation of electrical as-built drawings
  • Coordination of power


Similar Projects 


  • Camberwell Road, undergrounding OH powerlines
  • Bent Street, undergrounding OH powerlines


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: