Fawkner Street Upgrade
April 18, 2024

Balpara was engaged by Hume City Council as part of a streetscape upgrade on Fawkner Street, incorporating safety lighting assessment and design at stage 1.


Project Overview

 

The work for this project was undertaken in Fawkner Street, between Mickleham Road and Ardlie Street. Fawkner Street is a collector road that includes the Fawkner Street Village shops and is a main connection to the residential properties and road network within Westmeadows. The precinct has a distinct heritage character as well as a strong relationship to the natural features of the Moonee Ponds creek corridor, which was taken into consideration in the design. 


Balpara completed a safety lighting assessment and design for functional and feature lighting at this first stage of the project. 


Scope of Work


Balpara completed a safety lighting assessment and design for functional and feature lighting, established the power supply and servicing requirements, and project managed the installation of lighting. 


Lighting Assessment  

  • Site inspections were carried out, with existing electrical and lighting asset information and servicing requirements reviewed. 
  • Safety lighting assessment. 
  • Identification of rectification works required to reinstate the area to minimum lighting standards as required. 
  • Summary report with recommendations provided. 

 

Concept & Detail Design  

  • Design presented to Council in line with AS3000, AS/NZS 1158 and any other relevant standards incorporating computation details and sketches, which included relocation of light/electrical pole. 
  • Bespoke feature lighting design including feature lighting to existing and proposed trees, and lighting within proposed fixtures and furniture. 
  • Documentation and a Bill of Quantities and cost estimate for lighting design (including both bespoke landscape lighting and AS lighting) was issued for Council to tender. 
  • Liaising with council landscape architect to coordinate all works with Civil and Landscape documentation. 


Value Add


Balpara directly interfaced with Jemena on behalf of the council to streamline the pole relocation process as we have a long-standing relationship with the power authority. Through Balpara's feature lighting design we engineered an aesthetic outcome to include up light of trees, LED strip lighting on benches, tables and chairs. This will result in a safe and visually enjoyable shopping precinct at night.   


Similar Projects


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.