Balpara was engaged by Winslow Civil Construction to complete NBN construction for this large urban development project, alongside project management requirements. 


Project Overview

 

Balpara has previously provided a range of services for earlier stages of the Grand Central Estate development, including electrical and NBN design, public lighting design, project management, detailing and pre-Powercor auditing services. Balpara's services were again requested for stages 9 and 10 of the large multi-stage Tarneit development, seeing our team provide NBN construction, electrical design, drafting and project management services. 

 

Balpara was tasked with the electrical design on construction drawings for all lots while complying with technical standards, and producing detailing and as-built drawings in line with applicable standards. This plan showed the full extent of the main local duct, local network pits, local lateral duct and ‘starter pipe’ that were required, and formed the basis for telecommunications construction tenders. 

 

Our team was responsible for project managing the implementation of the electrical infrastructure, as well as coordinating the of tendering for electrical contractor in conjunction with the civil contractor. 


Project Scope

 

  • Creating the NBN Fibre Distribution Hub locations concept plan to ensure sufficient space was allocated and that all locations satisfied the NBN Co's comprehensive criteria list. 
  • Designing individual stage telecommunication ‘pit and pipe’ to NBN Co standards. 
  • Creating and submitting an application and plans for formal approval to the relevant authority. 
  • Constructing the pit and pipe network. 
  • Completing and submitting as-built plans for approval to NBN Co. 
  • Coordinating works between the civil and NBN installation contractors to ensure the works progressed in a timely manner that minimised risks. 
  • Requesting and overseeing the final compliance audit by NBN Co. 
  • Receiving audit results from NBN Co Approved Auditors and advising civil contractors of any rectification works required.


Value Add

 

Balpara was able to offer a range of services to the client, effectively fast-tracking the process. Our previous work on earlier stages of the project additionally gave our team greater knowledge of the site, allowing for faster identification of issues and their resolutions. 

 

Relevant Accreditation/Quality Standards

 

Balpara is ISO 9001 certified, all electrical project management and negotiations were performed by accredited PM2 mangers, and all electrical design was completed to Powercor Standards and NBN design to NBN Standards. 


Similar Projects

 

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.