Melbourne Pit Inspection Program
April 23, 2021

Balpara has been engaged by Powercor to perform pit inspections across the CitiPower network as part of its large-scale pit inspection program.


Project Overview

Over the next seven years, this program will see the inspection of 500 pits across Melbourne’s metropolitan area for the purpose of identifying any repairs or maintenance that may be required before further works can take place.

 

Balpara’s specialist teams of underground lineworkers are performing regular pit inspections for the client, utilising 3D LIDAR technology to create highly accurate scans.

 

Project Scope

 

  • Using a 3D LIDAR scanner to scan all areas of the pits to assess structural integrity
  • Identifying issues such as cracks or damaged slabs that require maintenance or upgrades prior to further work being performed
  • Providing comprehensive scans that include highly accurate, repeatable and traceable measurements 
  • Preparation of all scans in various file formats as per the client requirements


Value Add

 

Balpara has been working with CitiPower Powercor for over a decade. The longevity of Balpara’s relationship with this client, as well as this particular contract, demonstrates that we have continually met and exceeded expectations with high-quality and thorough work.

 

Relevant Accreditation/Quality Standards


  • Balpara has completed all training aligned to the VESI requirements that allows us to work to CitiPower standards.


Similar Projects

 

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: