Balpara was engaged by Powercor to examine six regional Victorian substations as part of the Rapid Earth Fault Current Limiter program (REFCL). This included feature survey, LiDAR scanning, GPR, geotechnical investigations and soil testing and analysis for targeted regional zone substations.
Project Overview
As part of the Victorian Government’s program to reduce powerline-related bushfires, the REFCL program has been established to operate like large, strategically positioned safety switches in targeted areas of Victoria’s electricity network, reducing the risk of fires starting from powerline faults.
Balpara's team was required to provide a range of services to this project. Our use of the latest technology allowed us to offer exceptionally accurate 3D laser scanning data, while the use of GPR saw us able to provide accurate asset location services. The client also required soil testing, soil contamination analysis and geotechnical services, which Balpara completed to ensure the site was fit for use.
Project Scope
Value Add
Balpara successfully delivered a range of services on site to optimise productivity while the substation was accessible in a very specific window of time. Our 3D modelling and surveying team created a solution best suited to our client, using a combination of traditional and cutting edge modern site capture techniques to produce the best outcome tailored to our client.
Relevant Accreditation/Quality Standards