Beaconsfield Reconductoring Project
December 19, 2017

At Balpara we deliver electrical engineering and surveying services to our clients across Australasia. For over forty years now, we have serviced the energy, resources, communications and land development industries.

Balpara was engaged by AusNet Services to provide Overhead Electrical Surveying, Survey Design and Drafting Services as part of their major Electrical Conductor Replacement Program.

Scope

The Beaconsfield Region is the latest area in AusNet’s plan to remove all copper conductors from their distribution network.

All copper was replaced with safer, stronger conductors which are made from a combination of aluminium and steel strands. To maximise project efficiency opportunities; old, rusty steel conductors are being replaced with new, improved equivalents as part of the program.

The extensive project area covers 150km of overhead line and Balpara has worked on 90km thus far.

Balpara’s Involvement

Services we provided to this project:

The information collected on site is conveyed to the office and included in our drawings during the drafting process. Once drawings are approved by AusNet Services, they are distributed for construction with technical guidelines set-out on the drawings to ensure the works are carried out correctly.

ISO9001 | Our Commitment to Quality

Balpara has held ISO9001 certification for more than six years now without any non-conformances and we are currently transitioning from ISO9001:2008 to 2015. This being a reflection of our commitment to continuous improvement and quality.

Our Technical Expertise

We provide project management, electrical engineering, surveying, VEDN auditing, drafting and detailing as well as 3D modelling & structural engineering services. Our services can be delivered on location or from the Balpara office.

Australian owned and operated, we build strong relationships with our customers to provide cost-effective solutions that ensure the best outcome for each project.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: