Decorative Public Lighting Poles Audit, Waterways Estate
December 3, 2020

Balpara was engaged by Kingston City Council to test and evaluate the integrity of 39 decorative public lighting poles in Waterways Estate.

 

Project Overview

 

As part of maintenance work on its electrical infrastructure, Kingston City Council enlisted Balpara to perform an audit of 39 decorative light poles located within Waterways Estate, an area which is made up of man-made wetlands and lakes in the middle of a residential estate.

 

As with any electrical infrastructure, these light poles require periodic inspection, however their proximity to water make them particularly susceptible to corrosion and rust.

 

Project Scope

 

  • Testing for structural damage, including broken welds, tampering, nut loosening, missing covers, internal or external corrosion, and foundation problems.
  • Utilising a shell thickness indicator to determine existence and extent of any interior decay.
  • Assigning each of the 39 light poles with a rating in a condition report with recommendations on each.
  • Assessing the base of each light pole for structural integrity.
  • Providing guidance on when the next audit should be conducted to ensure optimum performance.

Value Add

 

The client initially believed many of the poles would need replacing, however after investigation, Balpara determined that in many cases it was only the decorative collar of the light pole that had acquired rust, while the rest of the pole still maintained structural integrity. This saved significant time and money for our client.

 

Relevant Accreditation/Quality Standards

 

  • All poles were assessed by a Certificate II qualified Asset Inspector.


Similar Projects

 


Download the Decorative Public Lighting Poles Audit case study here.


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: