Little Green Tarneit Residential Estate Project
December 20, 2017

Balpara successfully completed this URD project for PEET Limited. We performed the project management and electrical/NBN design services for the electrical infrastructure of the development. This included the electrical/NBN designs onto construction drawings for all lots to technical standards, coordination of electrical contractors in consultation with civil contractor, as well as the detailing and provision of As Built drawings.

Project Overview

Included in the project management, electrical/NBN design and drafting of the project were:

The project was delivered within budget and to timeframes as agreed to with PEET and resulted in a most positive post-project customer feedback report.

Our URD Expertise

Accredited with all Victorian utilities, VicRoads and VEDN for Electrical Auditing, we can provide a wide range of URD services in-house, such as PM, design, drafting, site detailing & auditing, to speed up the Statement of Compliance process.

ISO9001 AS/NZS2016
Our Commitment to Quality

Earlier this year, we had a combined ISO9001 re-certification audit and a quality management system review to the new AS/NZS 2016 standard, which we passed. As a result we are now ISO9001 certified to the International 2015 and AS/NZS 2016 Standards and have held our certification without non-conformances since 2011.

The new standard has a greater integration of the Quality Management System into our day to day business processes, assesses risk at any stage of our service delivery and considers all interested parties relevant to our business at any stage of a project.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: