Major Roads Projects in Victoria
November 25, 2024

Balpara has been engaged to deliver a variety of services across multiple aspects of the Major Roads Projects Victoria (MRPV) roll out. 

 

Project Overview

Major Road Projects Victoria is the organisation behind the North East LinkWest Gate Tunnel, and Big Build Roads delivering dozens of essential freeway and road upgrades across the State.

 

It is an ambitious project for Victoria that has been in progress for many years. MRPV’s commitment is to reduce traffic congestion in a State with a growing population, while making the roads that Victorians rely on every day safer for all users.

 

Beyond the impact on Victoria’s transport network, MRPV is working to leave a legacy that benefits communities and provides sustainable employment and supply chain opportunities for some of Victoria’s most disadvantaged groups.

 

Scope

These projects are still underway and Balpara continues to work through the various project deliverables across our full suite of services. To date, we have provided the following services across multiple projects and stages:

 

  • Public lighting design and Lux Level assessment
  • AS3000 design
  • Electrical asset relocation
  • Electrical and communications design
  • Overhead pole surveying and design
  • Asset and feature surveying
  • Detailing and auditing
  • Soil testing and geotechnical services
  • Cable tracing and GPR locating
  • Engineering design and project management (including PM2 recognised services)

 

Value Add

Balpara’s specialised and unique experience in the Victorian electrical sector enables the delivery of a broad range of services. These services have been delivered to various components of all programmed major roads works as part of the MRPV. We’ve become the first choice for many providers due to our speciality expertise, extensive knowledge and proven experience, reliability and credibility.

 

Accreditations

Balpara has all relevant accreditation and certifications required. We currently work with Victorian Utilities, Authorities and Councils, are VEDN approved VicRoads accredited. Our people are VESI accredited Balpara is also and have a credible history with clients across Victoria.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025