Mentone Level Crossing Removal
June 12, 2020

Balpara was engaged to provide detailing and VEDN auditing services for the Balcombe Road section of the Mentone Rail Cross Removal project, a significant rail removal project in Melbourne’s south-east.

 

Project Overview

 

Following community consultation, planning and engineering advice, this particular rail crossing removal project will see the rail line lowered into a rail trench, with roads to be rebuilt at their current level. The level crossing is set to be removed by late 2020.

 

A new Mentone Station will be built as part of the project, as well as more than three kilometres of walking and cycling paths connecting the Mentone and Cheltenham station precincts. It will also include landscaping, and improved lighting, accessibility and car parking.

 

Balpara’s role involved VEDN auditing and detailing of the electrical cables. Our team was also required to provide detailing of the electrical assets being relocated and assist in the asset location.

 

 

Project Scope

 

  • Assist in the relocation of electrical assets from overground to underground
  • Detailing of overhead powerline relocation works for the train upgrades - all 22kv underground civil and electrical assets
  • Providing electrical project management and liaising with civil engineers and civil contractors to ensure Powercor standards were met
  • Completing VEDN auditing of kiosk sub-station installation
  • Detailing as-built drawings in-line with findings from site investigation

 

Value Add

 

The Balpara team were on-site every day, working closely with United Energy and all related parties. Our PM2 accredited project management team ensured a streamlined and collaborative approach that resulted in the project being delivered with no failings.

 

 

Relevant Accreditation/Quality Standards

 

All audits were VEDN compliant and completed to United Energy standards.


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: