Balpara was engaged to perform a geotechnical assessment and soil testing for Stage 2 of the Southeast Business Park site in Pakenham. 


Project Overview


As part of the Business Park’s Stage 2 development, Balpara provided a geotechnical assessment report and facilitated soil testing to determine the suitability of future works at this industrial and commercial development. 

 

The geotechnical assessment involved the drilling of six horizontal boreholes, which were drilled at approximate locations along Henty Street, which runs parallel to the rail tracks. Soil samples were collected from each of the boreholes for geotechnical classification. Findings were prepared in a detailed report along with recommendations regarding bearing, soil strength and founding depths for the proposed works. 


Project Scope

 

  • Project managing the extraction of soil samples from each borehole for laboratory testing to determine soil classification and profiling. 
  • Classification of the site based on site investigation, geology and topography of the area. 
  • Preparation of geotechnical report containing recommendations regarding appropriate founding depths, excavatability, side support and suitable vertical bearing pressure for the proposed works at the industrial and commercial development. 
  • Preparation of material parametres based on results from laboratory soil testing. 
  • Proposing parametres regarding retaining structures based on the soil classification that was identified on site.


Value Add

 

Balpara provided a streamlined service for the client, coordinating soil testing alongside geotechnical services. 

 

Relevant Accreditation/Quality Standards

 

All testing and observations were performed according to the provision of AS1726 – 2017 (Geotechnical Site Investigations). 


Similar Projects

 

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.