RACV Resort Electrical and Communication Infrastructure Upgrade
August 23, 2021

Image copyright: https://www.racv.com.au/travel-leisure/racv-resorts/our-destinations/inverloch-resort/accommodation/deluxe-twin-cabin.html


Balpara was engaged as the primary electrical engineering and design consultant for the AS 3000 electrical upgrade of RACV Resort’s Inverloch accommodation. 


Project Overview

 

Balpara was tasked with the electrical engineering and communication design for the upgrade of RACV’s Inverloch Resort, located south-east of Melbourne. The scope of design for this urban development consisted of 17 double bedroom cabins and six single bedroom cabins. 

 

After performing Maximum Demand investigations, Balpara recommended sourcing the new electrical infrastructure supply from the main electrical switchboard located next to the Kiosk Substation. Due to the remote location of the new cabin upgrade, this meant having to run approximately 600 metres of large electrical sub-main cables from the main switchboard to the new cabin site. To do this, Balpara had to negotiate existing infrastructure in order to find an acceptable cable route. 


Project Scope

 

  • Performing maximum demand investigations to determine electrical capacity of the main switchboard 
  • Devising an AS 3000-complient full electrical design of sub-main cables. 
  • Detailing as-built drawings of electrical infrastructure in line with AS 3000 standards. 
  • Conducting earthing design and field-testing studies to ensure new system satisfied utility requirements. 
  • Maintaining drawing register throughout the project. 
  • Carrying out full communication design for each cabin upgrade. 
  • Undertaking negotiations with the relevant utility to source additional supply requirement and achieve economical results for the client. 
  • Conducting regular site visits to ensure timeframes were met as part of our project management service.
  • Acting as the primary electrical engineering and design consultant throughout the duration of the upgrade.


Value Add

 

Balpara's electrical engineering and design expertise saw our team able to reduce the electrical load required for the cabins. As a result, this will decrease demand charges, creating a more cost-effective energy solution for our client. 

 

Relevant Accreditation/Quality Standards

 

All electrical designs were performed to AusNet and AS 3000 standards. 


Similar Projects

 

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.