Balpara was engaged by Downer to perform survey set-out works for the upgrade of the Bendigo Line.
In preparation for incoming Regional Fast Trains, the Bendigo V/Line Rail Network requires an upgrade to its existing signalling infrastructure.
During Stage 1 of this project, Balpara was tasked with surveying an area of approximately seven kilometres between Kyneton and Malmsbury, and providing a set-out of the conduit lines to be installed in pits. Our team was also required to peg out approximate locations of existing assets and foundations for the axle counters, which signal directly to the Grade Crossing Predictor (GCP).
Balpara has a reputable history of completing projects of a similar scope. Our dedicated survey team has extensive experience, allowing Balpara to deliver a thorough and cohesive solution for the client from the outset of the feature survey through to its completion.
Balpara has held ISO9001 certification for over six years without non-conformances and attained re-certification to the new AS/NZS 2016 Standard. All works were performed in accordance with the relevant standards, including Australian Rail Codes of Practice and VicTrack Standards and Procedures.