Waratah Place Zone Substation Project
July 20, 2019

 

Balpara was engaged by Daly’s Constructions Australia to devise an electrical design and as-built detailing for the installation of 66kV circuits at the new Waratah Place Zone substation.

 

Project Overview

Balpara's electrical engineering team was enlisted by Daly’s to devise an electrical design, including as-built detailing, for the installation of 66kV circuits at the new Waratah Place Zone substation in Melbourne’s CBD. The new zone substation forms a major part of the Metro and CBD Security of Supply project, the purpose of which is to meet increased demand from residential and commercial growth in the CBD, as well to improve the reliability of the supply across the city.

 

In accordance with CitiPower, Daly’s and local manufacturer standards, we devised a design which mapped the best route for the installation of the 66kV circuits, in addition to marking out joint bay locations in the CBD.

 

Following the demolition of the previous zone substation ‘W’, new foundational structures were constructed, upon which a new zone substation has been built. The next and final phase of the project is the installation of new electrical infrastructure, including 10 x 66kV circuits, at the Waratah Place Zone substation.

 

By overlaying the 3D model with the 3D point cloud (see image above), we identified that previously designed ventilation ducts would not meet utility clearance standards. This finding ultimately saved the project significant construction and materials costs.

Project Scope

  • Preparation of route for 66kV cabling to cable specification
  • Creating electrical detailing and as-built drawings in line with applicable standards
  • Checking of civil base plan for water, gas and sewerage
  • Preparation of electrical as-built drawings once installation is complete
  • Design of electrical cable support structures within basement
  • 3D Scanning of basement to verify design tolerances
  • Flagging of any clashes within basement before electrical cables are installed
  • Electrical design of a new Duresca 66kV insulated bus bar for manufacturing by MGC (Switzerland)

Balpara has held ISO9001 certification since March 2011 without non-conformances and attained re-certification to the new AS/NZS 2016 standard.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.