Winton Solar Farm
July 12, 2020

Balpara was engaged by Yurika to complete a sub-transmission line design package, including design reports, drawings and certifications, to enable the construction of the 66kV transmission line between the Winton Solar Farm Substation and the Glenrowan Terminal Station.

 

Project Overview

 

Located near the Glenrowan Terminal Station in Central North Victoria, the Winton Solar Farm will convert energy from solar radiation into electrical energy through a series of photovoltaic (PV) solar modules and DC to AC inverters.

 

Balpara’s contribution to this project ensures the creation of a sub-transmission line design package that enables the construction of the 66kV line in accordance with AusNet connection agreement and standards.

 

 

Project Scope

 

  • Detailing survey and design calculations of a new double circuit 66kV sub-transmission line that will under-cross the existing 220kV transmission lines coming out of the Terminal Station.
  • Creating survey and design calculations of aerial earth and ADSS FOC between Glenrowan Terminal Station and Winton Solar Farm Substation.
  • Designing underground FOC selection and overhead powerline route selection between Winton Solar farm and Glenrowan Terminal Station.
  • Designing structural cable support for the substations.
  • Preparation of detailed electrical as built drawings to AusNet standards.
  • All design certifications completed to AusNet standards.

 

Value Add

 

Balpara was recommended for this project due to its long-standing relationship with the relevant utility, and previous successes in delivering projects in a timely, professional manner that has mitigated potential delays in construction.

 

 

Relevant Accreditation/Quality Standards

 

Balpara is ISO9001 certified and AusNet accredited for surveying, design and drafting.


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: