Balpara was engaged by Lend Lease with the endorsement of AusNet Services to provide powerline surveying services and electrical design services to establish a new fibre optic cable route as part of the new Cherry Tree Wind Farm project. This 40km cable will increase the reliability of the AusNet Services electricity network and help to measure and control the power being distributed in the area as required by the addition of the new wind farm.

 

Project Overview

 

Located between Seymour and Yea, the new 16 turbine Cherry Tree Wind Farm required a new 66kV powerline connecting into the existing powerline between these two towns.

 

This project is part of the government’s current push to increase the state’s renewable energy capabilities. The expected annual generation output from the wind farm will equate to powering 37,000 average Victorian households, avoiding the emission of 200,000 tonnes of CO2 annually.

 

Project Scope

 

  • Providing powerline surveying services to asses an existing 40km powerline route for a new fibre optic cable.
  • Completing Electrical Survey Design Calculations for the proposed new fibre optic cable.
  • Electrical drafting of Balpara’s calculated design onto construction plans, to allow material procurement and all construction activities to commence.
  • Electrical project management and implementation of works in coordination with stake holders.
  • Liaising and consulting with utility and construction representatives for total project collaboration.


Value Add

 

Balpara was earmarked for this project specifically for our expertise in this niche area of overhead powerline surveying. The team brought more than 50 years of industry experience to the project and is highly respected in this area of surveying overhead powerlines.

 

Relevant Accreditation/Quality Standards

 

  • Accredited Design Service Provider with AusNet.


Similar Projects

 


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: