Melbourne Metro Railway Project
December 20, 2017

Melbourne’s rail network is carrying more passengers than ever before, the fastest growing train lines are rapidly approaching capacity and many peak period services suffer from chronic overcrowding and unreliability. Demand is predicted to exceed capacity of current rail services during peak times and exacerbate overcrowding and delays.

Melbourne Metro is to provide a substantial uplift in capacity across the rail network. The infrastructure proposed for construction as part of Melbourne Metro: 


  • Twin nine-kilometre rail tunnels
  • Five new underground stations, including two in CBD
  • A new transport interchange at Domain
  • Two rail tunnel portals (entrances)


Balpara's Surveying Involvement:


  • Determining the exact location of a new pit to ensure excavation will avoid all existing assets.
  • We set out major electrical pits being built and then survey the topography around them. These pits are constructed using 600mm diameter re-enforced concrete piles and their footprint can be up to 6 by 6 metres wide and 4 metres deep.
  • Preparation of an office based assessment of the previously surveyed locations of all existing electrical conduits and other assets already in the ground.
  • Completion of site visit and provision of millimetre accurate set-out point to allow civil crews to cut the exact design location of the new pit in the ground.
  • Establishment of fixed survey control points at strategic locations around the new excavation which are to be monitored daily throughout construction.
  • Monitoring of the control points to the nearest millimetre to record any movement or lack thereof in the ground.


The Balpara results are supplied to Citipower by Daly’s as evidence that they employ the highest standards in construction and that the surrounding areas are not affected by their works.


Balpara’s Design & Modelling Involvement:


A new station in Domain is strategically placed to ease pressure on the St Kilda Road/ Swanston Street tram corridor and will significantly improve access to key Melbourne landmarks such as the Shrine of Remembrance and Albert Park. Construction of a temporary power substation on the southern end of Edmund Herring Oval, close to Domain Road was required, which resulted in Balpara’s involvement. This substation will provide power for the tunnel boring machines required to build the Metro Tunnel.


Balpara involvement across all locations:


  • We perform the detailing for all relocations and newly installed assets (22 & 66 kV UG poles and cable installations)
  • We survey new cable pits - location and monitoring


Arden | Dalys Construction


  • 66kV Pole installation
  • New 22 & 66kV UG cable installations
  • New 66kV Pole – 3D modelling & drafting


Parkville | Dalys Construction


  • Relocation of all electrical cables at Grattan St & Royal Parade
  • Location & monitoring of new cable pits


CBD North | Dalys Construction & Lendlease


  • Relocation of exixting oil-filled 66kV cables
  • Relocation of 22kV cables


CBD South | Powercables & Lendlease



  • Relocation of substation
  • Surveying of cable pits


You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.