Balpara was engaged by Lendlease to provide full network auditing services for Stage 1 and 2 of the Mordialloc Freeway. This multifaceted electrical engineering project saw Balpara provide a wide range of our capabilities to the client.

 

Project Overview

 

The Mordialloc Freeway is a large multi-stage project designed to improve travel times and ease congestion in Melbourne’s south east, and includes bridges, ramps, cycling paths and intersections. Balpara was involved in Stage 1 and 2 of this project, which saw us conduct works around Springvale and Centre Dandenong Roads.

 

Balpara’s role involved both overhead and underground VEDN auditing, detailing of the electrical cables, asset relocation, asset inspection, overhead powerline design, powerline distribution design and detailing As-Built designs.

 

Project Scope

 

  • Detailing of overhead relocation works.
  • Overseeing correct building and electrical standards of all overhead powerlines.
  • Ensuring the installation of underground electrical cables and conduits were completed as per United Energy design standards.
  • GPS surveying to ensure accuracy throughout the project.
  • Auditing of site to ensure no obstructions from utilities or communication services.
  • Testing trenches for correct depth and size.
  • Detailing and As-Built drawings in line with applicable standards.


Value Add

 

Balpara was specifically chosen for this project due to our expertise in VEDN Auditing and our VEDN accreditation. Our team was able to provide a full network audit, including civil and electrical audits, pre-commissioning, cable hauling and a final audit. This streamlined the process for the client, who had no need to hire an additional utility service, saving them time and money.

 

Relevant Accreditation/Quality Standards

 

  • All audits were VEDN compliant and completed to United Energy standards.


Similar Projects

 


Download the Mordialloc Freeway Full Network Audit case study here.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: