Underbank Estate Sewer Pump Station
September 24, 2020

Balpara was engaged by Urban Design and Management to provide electrical engineering and design services to the Sewer Pump Station located in the Underbank Estate, Bacchus Marsh.


Our electrical engineering and design team was required to assess the electrical demand and requirements of the water utility, after which they were able to design a suitable electrical supply.

 

Project Overview

 

After the Underbank Estate’s electrical infrastructure works were constructed, the initial designs of the Sewer Pump Station changed. Balpara worked collaboratively with Powercor and the project team to come up with a solution that minimised re-work to the existing electrical supply while still providing efficient and effective supply for the sewer pump station.

 

Project Scope

 

  • Provide recommendations of asset relocation in accordance with AS3000 design rules.
  • Determine if switchboard capabilities were in-line with requirements for the development.
  • Conduct electrical supply investigation to the pump station.
  • Provide electrical project management services by working in collaboration with Powercor and civil consultant to ensure sewer requirements for the development were met.
  • Conduct an electrical supply audit of wiring and cable location and capacity to suit the new switchboard and CT connections.
  • Provide recommendations regarding main circuit breaker to ensure correct supply to sewer pump installation.


Value Add

 

Balpara was previously engaged to work on the Underbank Estate project, allowing for a more streamlined service offering to the client and greater knowledge of the site.

 

Balpara’s responsiveness, knowledge and skills enabled a solution to be implemented quickly, minimising time and costs.

 

Relevant Accreditation/Quality Standards

 

  • Western Water Sewage Pumping Station design standard, WSAA Sewage Pumping Station Code of Australia, AS3000 – Maximum demand calculations for the SPS and Powercor Standards.


Similar Projects

 

Underbank Estate Development

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: