Project Overview


Wyndham City Council is creating a new city in the western suburbs. The new estate of Windermere Mambourin, 38 km from Melbourne’s CBD, is an enormous undertaking worth $1.9 billion according to developer Riseland Holdings.


Riseland Holdings is a Hong Kong based multinational real estate conglomerate, offering a wide range of services such as Residential Development, Commercial Real Estate operation, Property Management and Infrastructure Construction and Operation.


A project spanning 10 years, Windermere is a 363-hectare master-planned community nestled in the suburb of Mambourin. When completed in 2030 it will be home to 14,000 residents across 4700 lots. It incorporates 50 hectares of parklands, wetlands and a natural creek reserve. The estate includes four proposed schools (three state schools and one private school), a local convenience retail centre and 23 hectares of active open space, including bike paths, sports ovals, netball and tennis courts.


It is also close to major new transport infrastructure, such as the planned Outer Metropolitan Ring Road, major road upgrades and a proposed new rail station just outside the estate. 


Project Scope


Balpara, as the Electrical Consultant for Windermere, has been engaged to complete the following work:

  • Electrical Power Infrastructure Design.
  • Electrical VESI Project Management of both the Electrical Construction and Civil Construction on behalf of Powercor Australia.
  • Electrical Detailing of the Electrical Infrastructure to check that the Construction meets Powercor Australia Standards.
  • Telecommunications Design for “Redtrain Networks” as a Telecommunications Infrastructure Provider.


Balpara has worked on some major projects over the decades, yet this is one of the largest electrical infrastructure projects that Balpara has been engaged on to complete in terms of length and scope of services. 

 

Value Add

 

Balpara’s ability to provide be a one-stop-shop for the scope of this project adds value, creating efficiencies that reduce lead times. 

 

Relevant Accreditation/Quality Standards


  • VESI accreditation 
  • Accredited Public Lighting Designers for Department of Transport & Planning


Similar Projects

 

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: