Yarra Trams Acland Street Project
December 19, 2017

Balpara was engaged by Yarra Trams to provide electrical consultation on the Acland Street redevelopment project in St Kilda, a project that consisted of electrical distribution, AS3000 and public lighting design as well as the project management on behalf of Yarra Trams.

Scope

• Redesign and manufacturing of existing LV distribution cabinets; from circuit breakers to Webber fuse strips for all shop supplies
• Design of street lighting to AS3000 standard
• Feature lighting electrical supply for palm trees and plaza shelters
• VicRoads public lighting
• Cable tracing to all of the retail shops
• Load testing of existing cables
• Protection studies in conjunction with United Energy/ZNX
• Project Management of all the works

Our Technical Expertise

Project Management | Electrical Engineering Surveying | VEDN Auditing | Drafting 3D Modelling & Scanning | Detailing

ISO9001 - Our Commitment to Quality

We are committed to continuous improvement of our quality and are currently transitioning from ISO9001:2008 to the new 2015 standard after having held our ISO certification for over 6 years without major NCRs.

You may also like

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
Share by: