Project Management

March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
Balpara can provide IT specialists by secondments.
April 18, 2024
Balpara’s secondment program allows our clients to access the same individual when they need them throughout the project. Learn more about how it works here.
December 7, 2023
The Hume City Council contracted Balpara to provide soil contamination testing and geotechnical services in Somerton.
North East Link Project
December 5, 2023
Balpara was contracted by Jemena to undertake site surveying, drafting and electrical design between multiple Zone Substations for the North East Link Project.
October 4, 2023
Balpara completed site surveying and underground design for the existing overhead network and service networks across seven defence sites in Victoria.
October 4, 2023
Balpara has been chosen as the Electrical Consultant for Windermere incorporating design and project management.
https://www.baysidegroup.com.au/wp-content/uploads/2021/06/Corporate-Services-1.jpg
March 16, 2022
Balpara was engaged by Arup to provide road lighting consultant services for the Bunyip Station Works on the Gippsland Line Upgrade Project.
Lighting design
March 15, 2022
Balpara was engaged by Hume City Council to provide a cohesive delivery of Feature Survey, AS3000 Lighting Design, Utility Connection Design and Project Management for the Melrose Drive Activity Centre.
Grand Central Estate
November 16, 2021
Balpara was engaged by Winslow Civil Construction to complete NBN construction for this large urban development project, alongside project management requirements.
RACV Resort accomodation in Inverloch
August 23, 2021
Balpara was engaged as the primary electrical consultant for the AS 3000 electrical upgrade of RACV Resort’s Inverloch accommodation.
Show more